Demolition

Interior strip-out of a private clinic
Mariannengasse 16, 1090 Wien

Vienna, Austria / 03.2025 - 12.2026

As part of the expansion of the Mariannengasse Private Clinic, interior demolition works have been carried out since March 2025. The existing building is being selectively stripped out internally to create space for the future redesign and extension of the facility.

Facts & Figures


Company

Prajo & Co GmbH

Type

Demolition

Runtime

03.2025 - 12.2026

Interior demolition as part of the building extension

The works are being carried out in phases and in compliance with all applicable safety and protection regulations. Interior structures, installations, and fittings that are no longer required are carefully removed and properly disposed of. At the same time, the existing building fabric is being preserved and prepared for further use.

The aim of these measures is to structurally prepare the building for the clinic’s expansion and to enable the implementation of a modern, future-oriented infrastructure. am Standort.

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.