Interior strip-out of a private clinic
Mariannengasse 16, 1090 Wien
Vienna, Austria / 03.2025 - 12.2026
As part of the expansion of the Mariannengasse Private Clinic, interior demolition works have been carried out since March 2025. The existing building is being selectively stripped out internally to create space for the future redesign and extension of the facility.
Facts & Figures
Company
Prajo & Co GmbH
Type
Demolition
Runtime
03.2025 - 12.2026
Interior demolition as part of the building extension
The works are being carried out in phases and in compliance with all applicable safety and protection regulations. Interior structures, installations, and fittings that are no longer required are carefully removed and properly disposed of. At the same time, the existing building fabric is being preserved and prepared for further use.
The aim of these measures is to structurally prepare the building for the clinic’s expansion and to enable the implementation of a modern, future-oriented infrastructure. am Standort.